If you live in the Portland area and you are wondering whether it is time for new windows, here is the short answer. Replace them when you see fog between the panes, soft or rotted wood at the sill, single pane glass that runs wet every cold morning, or a bedroom window that will not open. As for timing, the windows here are built to order, so the best plan is to notice the problem in winter, order then, and let the install land in a drier stretch.
Most advice online is a national list of seven signs and a season-by-season chart that could be about anywhere. Below we use Portland's own NOAA weather normals, the temperature limits printed on real sealant data sheets, and our own lead times. Sources are at the end.
Not sure if your windows are done?
We look at every window, tell you which ones need replacing and which can wait, and leave one written price that names the exact Milgard series. No minimum: we quote one or two windows too.
OR CCB 198186 · WA L&I EXTERDC884PP · Family business since 2002
Signs it is time, Northwest version
- Fog or film between the panes. Moisture got inside the sealed glass and cannot be wiped off. The seal does not get fixed in place; the glass or the window gets replaced.
- Soft sills and bottom rails. Wood decay needs moisture, and decay fungi need wood at roughly 20 percent moisture or more to grow. Portland sees measurable rain on about 93 days a year, so sills that stay wet from October through April are where rot starts.
- Single pane glass or bare aluminum frames. Single glass is around U-1.0, against Oregon's code range of U-0.27 to 0.30 for new windows, and metal frames without a thermal break conduct heat fast. The U.S. Department of Energy puts windows at 25 to 30 percent of home heating and cooling energy use.
- Windows that stick, will not stay up, or will not lock. In a bedroom this is a safety problem, because that window is the escape route.
- Drafts across several windows that weatherstripping does not fix.
For the full picture on how long each frame material lasts and what fogged glass means, see how long windows last in Portland.
A sign that usually can wait
Water on the room side of the glass is not the same as fog between the panes. Room-side condensation happens when the glass is colder than the air, and it is driven by indoor humidity from cooking, showers and drying clothes. On decent double pane windows, a bath fan and some airflow usually fix it. On single pane or aluminum windows that drip every cold morning, it is a real reason to replace. When you shop, a higher condensation resistance number on the NFRC label means a warmer inside pane.
The best time of year to replace windows in Portland
Here is what NOAA's 1991 to 2020 normals for Portland International Airport show, month by month:
| Month | Rain (in) | Days with rain | Avg high | Avg low |
|---|---|---|---|---|
| Jan | 5.03 | 12.3 | 47.5°F | 36.2°F |
| Feb | 3.68 | 9.3 | 51.5°F | 36.8°F |
| Mar | 3.97 | 11.1 | 56.8°F | 39.7°F |
| Apr | 2.89 | 9.0 | 62.0°F | 43.7°F |
| May | 2.51 | 7.3 | 69.3°F | 49.4°F |
| Jun | 1.63 | 4.6 | 74.3°F | 54.1°F |
| Jul | 0.51 | 1.5 | 81.9°F | 58.5°F |
| Aug | 0.54 | 1.6 | 82.3°F | 58.9°F |
| Sep | 1.52 | 3.5 | 76.7°F | 54.1°F |
| Oct | 3.42 | 7.9 | 64.4°F | 46.7°F |
| Nov | 5.45 | 12.2 | 53.5°F | 40.6°F |
| Dec | 5.77 | 13.0 | 46.9°F | 36.2°F |
June through September brings only about 11 percent of the year's rain. November through January brings about 44 percent. Vancouver's Pearson Field tracks within a few tenths of an inch. Milgard gives the same advice for the Northwest: the rainy season runs October through April, and July through September is the easiest stretch to install.
Rain limits a winter install here, not cold
The sealant and flashing data sheets tell the real story. A common latex caulk wants temperatures above 40°F and no rain for 24 hours. A solvent window sealant like OSI Quad Max is rated down to 0°F, but its maker still says not to apply it in rain, fog or mist, and to work on dry surfaces. DuPont window flashing tape works best above 25°F. Portland's average winter low is about 36°F, and freezing nights run about 8 a month in December and January. So cold rarely stops a window install here. Wet days do, which is why crews pick dry stretches and pick products rated for the season.
Can you replace windows in the winter?
Yes. Milgard says winter replacement works with a contractor who knows how to protect the house and which products to use, working room by room. On our jobs we open and close one opening at a time, so the house stays closed up even in an Oregon winter, and most homes take one to two days on site. A broken, unsafe or leaking window should not wait for summer.
Work backward from the build time
We install Milgard's V250 Style Line, V300 Trinsic and V400 Tuscany vinyl windows and its C700 fiberglass, and Milgard builds each one to the size measured at your home. Our lead time is 3 to 4 weeks from your signed order to install day, then one to two days of work. That gives a simple calendar:
| If you want new windows by | Sign the order by about | Why |
|---|---|---|
| Early July, before the hottest weeks | Late May | July and August average 82°F, and the June 2021 heat dome hit 116°F |
| The driest stretch, July to September | Mid June to mid August | Only about 11 percent of the year's rain falls June to September |
| Before the November rains | Late September | November to January brings about 44 percent of the rain |
| A broken or unsafe window | Now | Any season works with one opening open at a time |
If summer heat is your main problem, the glass matters as much as the frame. Our energy-efficient windows guide covers SHGC and low-E glass for west and south rooms.
Replace now or wait?
| Situation | Our call | Why |
|---|---|---|
| Bedroom window will not open, broken glass, will not lock | Now, any season | It is the escape route, and security matters |
| Soft sill or water getting into the wall | Now, in the next dry stretch | Decay keeps going while wood stays wet, and the rainy season runs October to April |
| Fog between panes on several windows | Order in winter for spring or summer | The seal will not come back, but it is not an emergency |
| Single pane or bare aluminum, high bills | Plan it, any season | Windows carry 25 to 30 percent of heating and cooling energy use |
| West or south rooms overheat | Order in spring | New glass is in before July and August |
| Room-side condensation only, double pane otherwise fine | Wait, fix humidity first | It is usually indoor moisture, not the window |
| One window bad, the rest fine | Replace the one | We have no minimum for windows |
Order now, install when it suits you
One visit, every window measured, and a written price with tear-out and haul-away of the old windows listed. Payment plans with zero down are available for qualified buyers. All financing is subject to credit approval. Rates, terms and payments may vary based on credit.
OR CCB 198186 · WA L&I EXTERDC884PP · Family business since 2002
Older house? The lead paint rule
More than half of Portland's homes were built before 1970, according to the Census Bureau's American Community Survey. In a home built before 1978, the EPA's lead renovation rule always covers window replacement, no matter how small the job, because taking out an old window disturbs painted surfaces. In Oregon the program is run by the Construction Contractors Board and the Oregon Health Authority, and the paint-disturbing work has to be done under a Lead-Based Paint Renovation license with lead-safe work practices. In Washington, the Department of Commerce runs the same program. It does not change the season, but it is part of planning a window job in an older Portland house.
Rebates do not need to drive your timing in Portland right now. Our window rebates guide has what is still open on each side of the river.
Frequently Asked Questions
Is winter cheaper for window replacement?
Milgard and other makers say off-season months are usually the slowest for installers, which can mean a shorter wait. Price depends on the windows and the job, not the month, so get a written price and compare.
How far ahead should I book window replacement?
With us, plan about 3 to 4 weeks from signed order to install day, plus the time to get an estimate. Milgard suggests starting to plan three to six months before the date you want, which leaves room to compare options.
Should I replace all my windows at once?
Not always. Replace the ones that are failing, unsafe or single pane first. Doing a whole side of the house at once keeps the look even, and one visit costs less time than several.
Do windows need replacing after a certain number of years?
No set number. Condition matters more than age, and the seal on double pane glass is usually the first part to go. Our window replacement in Portland and Vancouver page explains what we check on a visit.
Sources
- NOAA NCEI, 1991-2020 monthly climate normals, Portland International Airport (USW00024229) and Vancouver Pearson Field
- Milgard, Best time to replace windows (Pacific Northwest rainy season)
- DAP, Alex Fast Dry acrylic latex caulk technical data sheet (above 40°F, 24 hours dry)
- Henkel, OSI Quad Max technical data sheet (0°F to 140°F)
- Henkel, OSI Quad Max specification (no rain, fog or mist; dry surfaces)
- DuPont flashing systems physical properties (best above 25°F)
- U.S. Department of Energy, Energy efficient windows (25 to 30 percent)
- Efficient Windows Collaborative, Condensation
- USDA Forest Products Laboratory, Wood Handbook chapter 4 (moisture)
- APTI Practice Points 14 (decay needs about 20 percent moisture)
- NOAA Climate.gov, 2021 Pacific Northwest heat records
- EPA, Renovation, Repair and Painting program for contractors (window replacement always covered)
- Oregon Construction Contractors Board, specialty licenses (Lead-Based Paint Renovation)
- Washington Department of Commerce, Lead RRP program
- U.S. Census Bureau ACS 2024, year structure built (table B25034), via Census Reporter
Gorilla Works proudly serves Portland, Gresham, Beaverton, Hillsboro, Tigard, Lake Oswego, Happy Valley, Milwaukie, Troutdale, Vancouver WA, and Camas WA. Call (971) 343-4964 or request window installation.


