If you are about to replace windows in the Portland or Vancouver area and want to know what actually happens, here is the short answer. You call, we call back within minutes in business hours, we measure every opening and leave a written price, Milgard builds the windows to size in about 3 to 4 weeks, and a typical house takes one to two days on site. The whole thing usually runs about four to five weeks from the first call.
The pages that rank for this mostly read like do-it-yourself instructions, or give a national range of 4 to 15 weeks with no detail. Below is our real timeline, the per-window numbers Milgard publishes, and the install steps from Milgard's own installation guides. Sources are at the end.
Ready to start the clock?
Call or send the form. We set up a free visit, measure every opening, and leave one written price that names the exact Milgard series for each window.
OR CCB 198186 · WA L&I EXTERDC884PP · Family business since 2002
The timeline at a glance
| Step | How long | Who |
|---|---|---|
| Call or form to a call back | 1 to 5 minutes in business hours, next morning after hours | Us |
| Measuring at your home | About 10 minutes per window, a whole house usually under 2 hours | Us |
| Written price | Left after the measure, every window and series named | Us |
| Permit, only if openings change size | We handle it when it is needed | Us |
| Signed order to install day | 3 to 4 weeks, built to your sizes | Milgard, then us |
| Install day | Usually 1 to 2 days on site for a typical home | Our install crew |
| Clean-up, haul-away, walkthrough | At the end of the job | Us, with you |
| Register the Milgard warranty | A few minutes online | You |
For comparison, one national installer puts manufacturing alone at 4 to 12 weeks. Most of the wait in any window job is the factory, not the crew.
Step 1: The visit and the measure
Milgard calls measuring the most important part of the job, because a quarter inch off can mean a window that does not fit. A good measure checks each opening at several points, checks for square corners and a level sill, and looks for water damage or rot. We measure every opening ourselves before anything is ordered.
Curious how it is done? We wrote up the whole method in how to measure for replacement windows.
Step 2: The written price and the install method
The price we leave names the exact Milgard series and the number for every window, so you can compare it line by line. This is also where the install method gets decided. About 8 in 10 of our window jobs are full-frame tear-outs, where the old frame comes out down to the rough opening, instead of an insert that sits inside the old frame. In homes built anywhere from the 1940s to the early 2000s, which is most of what we see, the full-frame method lets us find hidden rot and redo the flashing.
The trade-offs are laid out in full-frame vs insert windows.
Step 3: The order and the 3 to 4 week build
Every Milgard window is built to the sizes from your measure, with the style, glass and color you picked. From your signed order, our lead time is 3 to 4 weeks, and we give you the install date at the estimate. A permit is only needed when an opening changes size or framing changes. A same-size replacement in Oregon does not need one.
The rules for Portland, Vancouver and the rest of the area are in our window replacement permit guide.
Step 4: Install day, one opening at a time
We open and close one opening at a time, so the house is never left open to the weather. Here is what happens at each window on a full-frame job, based on Milgard's published installation guidance:
- The old sash, frame and trim come out, down to the rough opening.
- The opening gets checked for rot and squared. Milgard's guidance follows the ASTM E2112 installation standard, which allows about 1/8 inch out of square for most windows.
- A sill pan goes in first. Milgard recommends at minimum a pan at the sill with a full interior air dam, so water that gets past the outer seal drains back out.
- A continuous 3/8 inch bead of sealant goes on the back of the window's mounting fins, then the window is set level, plumb and square.
- Flashing goes on in order: the sides first, then the top over the fins, so every layer sheds water down and out like shingles.
- The gaps around the frame are filled with low-expansion foam, which will not bow the frame, and the inside is sealed all the way around.
- Trim goes back on, and each window is opened, closed and locked to check operation.

Why our install day runs longer per window
You will read online that a window takes 30 to 60 minutes. Milgard gives that number for a basic window, and 2 to 3 hours for a full-frame replacement. Since most of our jobs are full-frame, our time per window sits closer to the longer end, and it is time spent on the part of the job that keeps water out. A whole home is still usually done in one to two days on site.
See your timeline in writing
We give you the series, the price and the install date for every window at the estimate. Tear-out and haul-away of the old windows are listed on the price. Payment plans with zero down are available for qualified buyers. All financing is subject to credit approval. Rates, terms and payments may vary based on credit.
OR CCB 198186 · WA L&I EXTERDC884PP · Family business since 2002
How to get ready for install day
- Move furniture and decor a few feet back from each window.
- Take down curtains, blinds and other window coverings.
- Clear the outside too: planters, wreaths, and room for a ladder at upstairs windows.
- Turn off window alarm sensors, and call your security company if needed.
- Plan for kids and pets to be away from the rooms being worked on.
- If your home was built before 1978, the job falls under the EPA and Oregon lead renovation rules, which add plastic sheeting and a cleaning check around each opening.
After the crew leaves
We clean up and haul away the old windows, then walk through the finished work with you. If your job has a permit, leave the window labels on until the inspector has seen them. Oregon's code requires the energy label to stay on until the building inspector checks it. Then register your Milgard warranty with the sales order number. Milgard covers the window, and our workmanship warranty covers the install: up to a limited lifetime on installs marked Limited Lifetime on your estimate, and 5 years on the rest.
What each Milgard warranty line covers is in our Milgard windows warranty guide.
Frequently Asked Questions
How long does it take to replace one window?
On site, roughly half an hour to an hour for a simple insert and 2 to 3 hours for a full-frame replacement, by Milgard's numbers. The wait before that is the 3 to 4 week build.
How long does it take to replace all the windows in a house?
A typical home takes us one to two days on site. Bigger homes, upstairs windows and openings with rot behind the trim take longer.
What happens if you find rot when the old window comes out?
We check every opening in older homes for hidden rot, and when we find it we fix the opening before the new window goes in. A full-frame job is the only way to see it.
Can windows be replaced in the rain?
Light weather is manageable because only one opening is open at a time, but sealants and flashing tapes want dry surfaces. On a truly wet day the install moves to the next dry one.
Want the bigger picture before you call? Start with our window replacement in Portland and Vancouver page.
Sources
- Milgard, The window replacement process (30 to 60 minutes basic, 2 to 3 hours full-frame)
- Milgard, What to expect
- Milgard, Installation (AAMA 2400 and 2410, foam, fasteners)
- Milgard, Installation recommendations for mounting-fin windows (sill pan, sealant, flashing order), PDF
- Milgard, Installation recommendations for flange and finless windows (ASTM E2112 tolerances), PDF
- ASTM E2112, Standard practice for installation of exterior windows, doors and skylights
- Milgard, Register your warranty
- Oregon BCD, 2026 ORSC Chapter 11 (N1104.4.1 labels stay on until inspection)
- Brennan Enterprises, How long does it take to install a window (4 to 12 weeks manufacturing)
- Stanek Windows, How to prepare for replacement windows
- EPA, Work practice standards under the RRP rule
Gorilla Works proudly serves Portland, Gresham, Beaverton, Hillsboro, Tigard, Lake Oswego, Happy Valley, Milwaukie, Troutdale, Vancouver WA, and Camas WA. Call (971) 343-4964 or request window installation.


