Want a quote you can check against this list?
Get a free written fence quote.
OR CCB 198186 · WA L&I EXTERDC884PP · Family business since 2002
Step 1: Check the license before anyone measures
Oregon. Anyone paid to build a fence must hold an active license, and the state treats a fence as part of the home, so it is residential work. Most fence companies are licensed with the Construction Contractors Board (CCB). Search by license number, business name or phone number on the CCB license search, or call the CCB at 503-378-4621. The CCB says a lookup tells you whether the license is active and has a bond on file, whether proof of liability insurance was filed, whether the company carries workers' compensation, and any complaints in the past 10 years. Insurance proof is filed when the company is licensed and at renewal, so ask for a current certificate too.
One Oregon detail most guides miss: a business licensed with the Landscape Contractors Board can also build fences. If a company does not show up in the CCB search, check the Landscape Contractors Board before you assume it is unlicensed.
Washington. Every contractor must be registered with Labor & Industries, and working or even advertising without registration is a gross misdemeanor. The L&I Verify a Contractor tool shows the registration, bond and insurance, workers' comp, safety citations and any lawsuits against the bond. A company that builds on both sides of the river needs both.
What the bond is, and is not. The state bond is not a fund you can draw on when a job goes wrong. In Oregon you can reach it only with an open CCB complaint and a court judgment or arbitration award, and the amount is shared with anyone else making a claim. Washington's required disclosure says the same: the bond "might not be sufficient to cover a claim". It is a minimum, not a guarantee.
Gorilla Works builds under Exteriors Design Contractors, Inc.: Oregon CCB #198186 and Washington L&I registration EXTERDC884PP. You can look up both.
Step 2: Get the same fence quoted by everyone
Give each company the same length, height, material, number of gates and the same answer on the old fence. Otherwise you are comparing different jobs. Mark the line with stakes or flags before the visits so everyone measures the same run.
Step 3: Compare the quotes line by line
This is what we put on our own written quotes, and what we would look for on anyone else's.
| Line on the quote | What to look for | Why it matters |
|---|---|---|
| 1. Post type | Pressure-treated posts rated for ground contact, or galvanized steel posts. Ask which. | Posts fail first in Portland's wet soil. A post not rated for ground contact can rot out years early. |
| 2. How posts are set | Depth, concrete, and whether there is gravel in the bottom for drainage. | A shallow post in wet clay is the most common reason a fence leans. See post spacing and depth. |
| 3. Post spacing | The distance between posts. | Wider spacing means fewer posts and a lower price, and more sag between them. |
| 4. Board grade | The cedar grade in writing, for example Grade 1 or Clear. | Lower grades have more knots and twist and crack in a wet climate. We use Grade 1 or better at no upcharge. |
| 5. Fasteners | Stainless steel, or at least the type named. | Ordinary steel nails react with cedar and leave dark streaks down the boards. |
| 6. Rails, kickboard and trim | How many rails, whether there is a kickboard, and any top cap or post caps. | A kickboard keeps the boards off wet soil; a top cap keeps rain out of the board ends. |
| 7. Gates | Each gate listed with its width, frame and hardware. | Gates are where cheap builds sag first. |
| 8. Tear-out and haul-away | Whether removing the old fence is included, priced per foot, or left to you. | A low quote that leaves the old fence in your yard is not a low quote. Ours is priced per foot on the written estimate. |
| 9. Locates, permits and approvals | Who requests the 811 locate, and whether your fence needs a permit or HOA approval. | Oregon and Washington law both require a locate request at least two business days before anyone digs post holes. |
| 10. Warranty in writing | Length of the workmanship warranty, what it covers (gates?), and any manufacturer warranties on posts or panels. | A warranty that is only spoken is hard to use. Ours is 3 years of workmanship on Silver, or 5 on Gold and Platinum, with gate adjustments for the whole term, in writing. |
Step 4: Read the contract and the notices before you sign
Oregon. A residential job priced over $2,000 needs a written contract. The state's rules say it must show the contractor's name, address, phone and CCB number; your name and address; the job address; a description of the work; the price and payment terms; and your rights, including the right to file a complaint with the CCB and any mediation or arbitration clause. On or before the day you sign, the contractor must also give you three notices: the Information Notice to Owner About Construction Liens, the Consumer Protection Notice and the Notice of Procedure.
You can cancel a new residential contract in writing until midnight at the end of the next business day, unless you both agreed work would start sooner or the contractor has substantially begun the work. If the contractor came to you and you signed at home, Oregon's home solicitation law usually gives you until midnight of the third business day instead, and the contractor must tell you so in writing and out loud.
Washington. Before work starts on a residential job of 1,000 dollars or more, the contractor must give you a signed "Notice to Customer". It lists the registration number and bond, warns that the bond might not cover your claim, tells you that you may hold back part of the payment, and tells you that you can ask for lien releases from suppliers and subcontractors.
This is general information, not legal advice. The CCB and L&I pages listed under Sources have the full rules.
Red flags
- No license or registration number on the quote, the truck or the website.
- A price that is only good if you sign today.
- A demand for the full price up front, or cash only. The Oregon CCB's advice: "Never pay the full amount up front and don't pay in cash."
- A one-line quote: "6 ft cedar fence, 120 ft" with no posts, grade, gates or warranty.
- Someone at your door right after a windstorm, offering to start today. The CCB warns that "Legitimate contractors wait for you to contact them," and Washington L&I says scam reports spike after big wind storms.
- No written estimate or contract, or a "special price" if you sign today (warning signs from the Washington Attorney General).
How Gorilla Works answers this list
Oregon CCB #198186 and Washington L&I EXTERDC884PP. Posts 24 inches deep in fast-setting concrete: pressure-treated ground-contact posts on Silver and Gold, PostMaster G90 steel posts on Platinum. A written price at the visit, or by the end of the day on a complex job. Grade 1 or better western red cedar at no upcharge and stainless fasteners on every cedar fence. Each gate on its own line. Tear-out and haul-away priced per foot. 811 locates requested at least two business days before we dig. A limited 3-year workmanship warranty on Silver, or 5 years on Gold and Platinum, in writing, with gate adjustments covered for the whole term. Every install crew is led by an installer with 5+ years of experience. Most fences start 3 days to a week after you sign.
Get a free written fence quote
We measure the run and give you one written price you can check against this list.
OR CCB 198186 · WA L&I EXTERDC884PP · Family business since 2002
See how a fence job goes, step by step.
Frequently Asked Questions
How many fence quotes should I get?
Two or three is enough to see the range, as long as each one prices the same fence.
Is the cheapest fence quote a red flag?
Not by itself. Check what is missing from it first: posts, cedar grade, fasteners, gates, tear-out and the warranty. The difference is usually there.
How do I check a fence contractor's license in Oregon?
Search the license number, business name or phone number at search.ccb.state.or.us, or call the CCB at 503-378-4621. If the company is not there, check the Landscape Contractors Board, which can also license fence builders.
Do I need a contract for a fence?
In Oregon, yes, when the price is over $2,000, and it must list the work, price, payment terms and your rights. In Washington, the contractor must give you a signed disclosure before starting any residential job of 1,000 dollars or more. Either way, get the whole job in writing.
Does a new fence need a permit?
Most backyard fences need no building permit. Inside Portland a wood fence up to 7 feet needs none, and pool barriers always do. Other cities set their own rules, and some neighborhoods need HOA approval first; our city pages list each city's rules.
Sources
- Oregon licensing, written contracts over $2,000 and the right to cancel: ORS 701.021, 701.305 and 701.310
- Contract contents: OAR 812-012-0110; notices: OAR 812-012-0130 (Oregon Secretary of State rule text, checked 18 Nov 2026)
- Information Notice to Owner About Construction Liens: ORS 87.093
- Oregon CCB consumer tools and disaster scams
- Oregon CCB license search
- Oregon CCB bond and complaints
- Landscape contractors and fences: ORS 671.520 and 671.540
- Oregon home solicitation sales (3-day cancel): ORS 83.710 to 83.730
- Washington registration, bond and disclosure: RCW 18.27.020, 18.27.040, 18.27.114
- Washington L&I: verify a contractor
- Washington L&I: common contracting scams
- Washington Attorney General: home improvement scams
- Locate rules: ORS 757.557
- Locate rules: RCW 19.122.030
Gorilla Works proudly serves Portland, Gresham, Beaverton, Hillsboro, Tigard, Lake Oswego, Happy Valley, Milwaukie, Troutdale, Vancouver WA, and Camas WA. Call (971) 343-4964 or request fence installation.


