The timeline at a glance
| Step | What happens | How long it takes |
|---|---|---|
| 1. First call | You call or send the form | We call back within 1 to 5 minutes, 8:30 AM to 8:30 PM every day; after hours, the next morning |
| 2. The visit | We walk the line, measure and talk through material, height, gates and the old fence | About 60 to 90 minutes, at a time that suits you |
| 3. The written price | One price in writing with your package, posts, gates and tear-out | At the visit; on a complex job, usually by the end of the day |
| 4. Locates and rules | 811 marks buried utility lines; any permit or HOA approval is settled before the start date | At least 2 business days before digging |
| 5. Start date | Your crew is scheduled | 3 days to a week after you sign; a few materials take longer (Step 5) |
| 6. Build | Morning walkthrough, tear-out, posts, rails, boards, kickboard if you added one, gates, cleanup | About 2 days on site for a 100 to 150 foot cedar fence |
| 7. Walkthrough | A project manager walks the fence with you and hands over the warranty | Flag anything at the walkthrough or within 3 days |
Step 1: The first call
Call (971) 343-4964 or send the quote form on any page. During open hours, 8:30 AM to 8:30 PM every day, a person calls you back within 1 to 5 minutes. After hours, we call first thing the next morning. On that call we ask what you want to build or replace, roughly how long the run is, and when you would like it done, then set a time to come out.
Step 2: The visit and the measure
We walk the whole line with you. We measure the run, note the slope, look at the old fence and its posts, and check what is in the way: trees, roots, sprinkler heads, a shed, a neighbor's garden. We talk through the material and the height, where the gates go and which way they swing. The visit takes about 60 to 90 minutes.
This is also when we ask about the line itself. If you are not sure where your property line is, sort that out now, not on build day. Our fence and property line guide covers how to check, and who owns the fence covers a shared fence with a neighbor.
Step 3: One written price
You get one price in writing, usually at the visit. On a complex job, it typically comes by the end of the day. It shows the package you picked (Silver, Gold or Platinum), so you can compare it line by line with any other quote: the post type, the board grade, the fasteners, the trim, each gate, and the tear-out and haul-away of the old fence, priced per foot. It also states the warranty. Our minimum job is 20 linear feet. If you want to see what we look for when comparing two quotes, read how to choose a fence contractor.
If you want to spread the cost, financing is available on every fence we build, with approved credit. See financing for current plans. All financing is subject to credit approval. Rates, terms and payments may vary based on credit.
Step 4: Utility locates, permits and approvals
Fence posts go deep enough to hit a buried line, so before any digging we request utility locates through 811. Oregon and Washington both require at least two business days' notice. Crews from each utility then mark their lines with paint or flags.
The 811 locate covers the utilities' lines, usually up to your meter. Lines you own are not marked: Oregon's Utility Notification Center lists pool heating, power to an outbuilding, invisible dog fences and septic systems, and also says to take care with sprinkler and drainage lines. Tell us about those at the visit, or mark them before build day.
Most backyard fences need no building permit. Inside the City of Portland, a wood fence up to 7 feet needs none, and zoning caps a fence at 3 feet 6 inches in the front setback and 8 feet in the side and rear setbacks. Pool barriers always need a permit. Other cities set their own rules, and some neighborhoods need HOA sign-off first. Each of our city pages lists that city's rules: Vancouver, WA, Gresham, Beaverton, Hillsboro, Tigard, Lake Oswego and Oregon City.
Step 5: Your start date
Most fences start 3 days to a week after you sign. A few materials take longer to get in: specialty gates, Jasper steel panels (Jasper is in limited supply), specialty hog wire panel sizes, fences that need 8-foot pickets, and fences that need specialty posts. We build through the winter, so the season does not hold up your start date.
Step 6: Build day
Build day starts with a short walkthrough with you to confirm the scope. On a replacement, the crew then tears out the old fence and hauls it away. The posts go in next, 24 inches deep in fast-setting concrete: pressure-treated posts on Silver and Gold, PostMaster steel posts on Platinum. Because the concrete sets fast, in some cases the boards go up the same day. Rails and boards follow, then the kickboard if you added one (pressure-treated 2x6, 2x10 or 2x12, an extra charge), then the gates, which are hung and adjusted so they swing clear and latch. Every cedar fence gets stainless steel fasteners, so nail heads do not rust and streak the boards. Before the crew leaves, they clean up the line. A 100 to 150 foot cedar fence usually takes about 2 days on site.
Every install crew is led by an installer with 5+ years of experience, and every job runs on our own quality checklist.
Step 7: The walkthrough and your warranty
When the fence is done, a project manager walks it with you, checks the work against your written price, and settles payment. Check the line, the height, the gates and the cleanup. If anything is not right, tell us at the walkthrough or within 3 days, and we fix it.
You get the warranty in writing: a limited 3-year workmanship warranty on Silver, or 5 years on Gold and Platinum, with gate adjustments covered for the whole term. PostMaster steel posts carry a limited lifetime manufacturer warranty, and Colorbond steel fence materials carry a 10-year manufacturer warranty. The details are on our warranty page.
How to get ready for build day
- Clear the line: move planters, firewood, play sets and anything else within a few feet of the old fence.
- Mark what 811 will not: sprinkler and drainage lines, buried dog fence wire, septic lines, and any power line to a shed or detached garage. Anything you or a past owner buried, such as garden lighting wire, is private too.
- Talk to your neighbor if the fence is on or near the shared line, and agree on which side faces whom.
- Plan for pets: there will be a gap in the fence on build day, so keep dogs inside.
- Plan to be home twice: for the short walkthrough on the morning of build day and for the final walkthrough. You do not need to stay home in between.
- Have any HOA approval in hand before the start date.
- Make sure the crew can reach the backyard: a side gate, a driveway or a clear path for posts and boards.
After the crew leaves
A new cedar fence does not need a finish right away. If you plan to stain it, let new cedar weather 4 to 6 weeks first; our how to stain a fence guide has the steps and our stain dry time guide covers timing around Portland rain. Gates can settle in their first season. If a gate starts to sag or drag while your workmanship warranty runs, call us and we adjust it at no charge.
Frequently Asked Questions
How long does it take to build a fence?
Most of the time goes into scheduling, not building. Most of our fences start 3 days to a week after you sign, and a 100 to 150 foot cedar fence usually takes about 2 days on site. Utility locates need at least two business days before anyone digs.
Can a fence be built in the rain or in winter?
Yes. We build through the winter. Posts are set in fast-setting concrete, so in some cases the boards go up the same day.
Do I need to be home on build day?
Only twice: for a short walkthrough in the morning to confirm the scope, and for the final walkthrough with a project manager, who checks the work with you and settles payment.
How long does the free estimate take?
About 60 to 90 minutes. You get the written price at the visit; on a complex job, usually by the end of the day.
Do I need a permit for a fence in Portland?
Usually not. Inside the City of Portland a wood fence needs no building permit up to 7 feet, and zoning caps a fence at 3 feet 6 inches in the front setback and 8 feet in the side and rear setbacks. Pool barriers always need a permit. Our city pages cover each suburb's rules.
Do you remove the old fence?
Yes. Tear-out and haul-away of the old fence is priced per foot on your written estimate.
What if the fence is shared with my neighbor?
Talk before the visit if you can. Our who owns the fence guide covers how to tell whose fence it is and how neighbors usually split a shared line.
Sources
- Gorilla Works warranty terms
- Oregon locate rule: ORS 757.557
- Oregon Utility Notification Center FAQ ("installing posts of any kind requires a locate request")
- Oregon Utility Notification Center: private utility locators (private lines are not marked)
- Oregon Utility Notification Center: homeowners
- Washington locate rule: RCW 19.122.030
- Washington Utilities and Transportation Commission: call before you dig
- City of Portland, Fence Residential Building Permits
- City of Portland, Brochure 3: Fences, Decks and Outdoor Residential Projects
Ready to start the clock?
Call (971) 343-4964 or send the form. We set up a free visit, measure the run and give you one written price.
OR CCB 198186 · WA L&I EXTERDC884PP · Family business since 2002
Gorilla Works proudly serves Portland, Gresham, Beaverton, Hillsboro, Tigard, Lake Oswego, Happy Valley, Milwaukie, Troutdale, Vancouver WA, and Camas WA. Call (971) 343-4964 or request fence installation.